雙組份打膠機安裝順序是怎樣的?

瀏覽:0
雙組份打膠機安裝順序是怎樣的?這一問題是很多人都想知道的,下面小編就來為您講講。
What is the installation sequence of two-component sealant dispenser? This is a question that many people want to know, and the following small compilation will tell you about it.
1、雙組份打膠機設備應安裝在干燥、無粉塵、無腐蝕性氣體的壞境中(該要求與其他設備一致,當然如果條件達不到少爭取無腐蝕性氣體,畢竟設備中有電線以及管路這些配件抗腐蝕性不高)。
1. The two-component sealant dispenser equipment should be installed in a dry, dust-free and non corrosive environment (this requirement is the same as that of other equipment. Of course, if the conditions cannot be met, at least try to avoid corrosive gas. After all, there are wires and pipes in the equipment and these accessories have low corrosion resistance).
2、室內溫度更好控制在10~40度的室內堅硬地面上,地面應水平度要好。(小編這里說的地面水平度要好不一定要非常的平整才行,我們的設備在設計之初已經考慮到了地面復雜性的因素所以對地面平整度是有相當大的忍讓度的,只要不是幅度提別的大一般都可以正常工作。)
2. The indoor temperature should be better controlled on the hard indoor ground of 10~40 degrees, and the ground should be better leveled. (The ground levelness mentioned by Xiao Bian here should not be very smooth. Our equipment has taken the complexity of the ground into consideration at the beginning of design, so we have a great tolerance for the ground levelness. As long as it is not greatly improved, it can generally work normally.)
雙組份打膠機
3、雙組份打膠機安裝之前,應先檢查是否有因運輸、搬動造成的變形、損壞和緊固件松動情況,之前就曾經有客戶在移動打膠機的過程中把設備的智能控制系統的一個零部件碰掉了而導致設備無法正常運行,我們的工作人員到現場后才排查出的原因。
3. Before installing the two-component sealant dispenser, first check whether there is deformation, damage and fastener looseness caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the sealant dispenser, causing the equipment to fail to operate normally. Our staff found out the reason after arriving at the site.
4、我們可以根據地面平整度的實際情況來通過調整設備的可升降地腳螺栓來調整設備的水平度直到設備水平而穩固。然后按圖接線并可靠接地,把氣源接入機器所配帶的氣源接口,確保無漏氣現象。
4. First, we can adjust the levelness of the equipment according to the actual situation of the ground flatness by adjusting the lifting anchor bolts of the equipment until the equipment is horizontal and stable. Then connect the wires according to the diagram and connect the air source to the air source interface equipped with the machine to ensure that there is no air leakage.
5、向油槽中加注液壓油指定位置,46#液壓油(約為50升左右)。
5. Fill the oil tank with hydraulic oil to the designated position, 46 # hydraulic oil (about 50 liters).
6、接通電源并打開查看設備是否能夠正常運行。
6. Turn on the power and check whether the device can operate normally.
以上就是問題的解答了,您對此有什么不明白的地方,可以隨時來我們網站http://m.zkty.org.cn咨詢!
The above is the answer to the question. If you don't understand anything about it, you can come to our website at any time http://m.zkty.org.cn consulting service

上一篇:打膠機拉絲斷膠問題是什么情況引起的?
下一篇:如何才能保證打膠機的點膠精度?

  • 微信
主站蜘蛛池模板: 亚洲资源站资源网在线 | 99九九精品 | 国产一区二区三区免费 | 日韩欧美在线观看 | 国产91在线|亚洲 | 中文国产成人精品久久水 | 老司机免费福利视频无毒午夜 | 99热爱久久99热爱九九热爱 | 中文字幕国产综合 | 天天干天天爽 | 老子影院午夜理伦手机不卡 | 日韩亚洲一区中文字幕 | 国产二区三区毛片 | 五月婷婷激情视频 | 天天干天天插天天操 | 四虎成人精品在永久免费 | 97se亚洲国产综合自在线 | 在线手机福利免费福利院 | 国产毛片久久国产 | 成人亚洲国产精品久久 | 伊人中文字幕在线 | 狠狠色噜噜狠狠狠狠奇米777 | 性做久久久久免费看 | 国产成人免费午夜性视频 | 国产成人a大片大片在线播放 | 天堂毛片| 99久久做夜夜爱天天做精品 | 狠狠色噜噜狠狠狠狠米奇777 | 99热这里只有精品免费国产 | 99精品在线免费观看 | 中文字幕亚洲无线码在线一区 | 亚洲欧美日韩中文高清一 | 日韩中文字幕在线观看 | 伊人久久亚洲综合天堂 | 亚洲欧美一区二区三区久久 | 亚洲国产精品网站久久 | 毛片免费观看日本中文 | a毛片免费观看完整 | 五月天亚洲 | 亚洲一区二区三区麻豆 | 精品中文字幕在线观看 |